Copy
View this email in your browser

At the City, we continue to follow guidance from our partners at Public Health – Seattle & King County (PHSKC), Washington State Department of Health (DOH), and the Centers for Disease Control and Prevention (CDC) regarding COVID-19. We’re working round-the-clock to ensure our communities and our workforce can stay safe and healthy.  

Currently, the Seattle Department of Transportation is planning to continue with construction in your area. We are working closely with our Public Health — Seattle & King County partners, our construction management teams, and private contractors to ensure that everyone supporting this project is cautious and safe. If there are changes to the construction schedule or planned work, we will notify you once public information is available.  

The City of Seattle and King County are taking steps to protect the health of our community by making recommendations that are meant to slow the spread of novel coronavirus and reduce the number of people infected. Please learn more about COVID-19 at www.kingcounty.gov/covid

Thank you. 

 

March 20, 2020
 
We have completed the majority of sidewalk, curb ramp, and road panel work on N 50th St. Before we return later this spring to complete final asphalt paving, we will work to complete any final repairs.
 
Throughout the week of March 23, we’ll continue replacing sections of road pavement and sidewalks on both N 40th St and the Green Lake Loop.

See below for more information about new and continuing work planned for the week of March 23.

 
What’s New:

While pavement drives, please do not touch, cross, or walk across it. Pavement is hot and harmful to people and animals. 

Green Lake Loop:
  • Green Lake Way N: We are working from N 51st St to Kirkwood Pl N. Expect pedestrian detours and shifted travel lanes at that time
What’s Continuing:
  • Work Monday - Friday, from 7 AM to 7 PM 
  • For more information on our typical construction impacts, please visit our project website
N 40th St:
  • At Stone Way N: expect pedestrian detours, shifted travel lanes, and traffic occasionally reduced to a single lane with flaggers present to rotate traffic
  • At Bagley Ave N: expect pedestrian detours and shifted travel lanes
  • Wallingford Ave N: We expect to continue work at this intersection for as long as 3 weeks. Expect shifted travel lanes and pedestrian detours.
    • The bus stop on the NE corner of N 40th St and Wallingford Ave has been relocated 60 ft to the east to allow us to complete sidewalk repairs.
Green Lake Loop
  • The intersection of West Green Lake Way N and East Green Lake Way N: expect noise, pedestrian detours, and the island to be removed to maintain two-way traffic while we work

What we’ve heard: 
Each week, we’ll plan to answer a few frequently asked questions from the community.

When will work wrap up on Green Lake Way?
We are currently repairing sidewalks, curb ramps and road panels on Green Lake Way. We anticipate completing final paving on this roadway in Spring 2021.  

Will trees be removed during this project?
Anytime a tree needs to be removed for our work, we will plant two additional trees to replace it during restoration.

We are coordinating with Puget Sound Energy (PSE) who is also working in the area.

PSE's natural gas project has begun restoration work on East Green Lake Dr N between Stroud Ave N and Corliss Ave N in March.  If you have questions about their work, you can contact them at  425-505-3768 or MajorProjects@pse.com.

Please share this email with others who might be interested in receiving project information and construction updates, and feel free to get in touch with us if you have any questions.

How to stay informed

Call us (206-693-4151) or email us (greenlakepaving@seattle.gov) with questions during construction


The City of Seattle is paving portions of N 40th St, N 50th St, N 80th St and streets on the east side of Green Lake as soon as 2019. To request translation of these materials, call 206-693-4151.
La Ciudad de Seattle pavimentará porciones de las calles N 40th St, N 50th St, N 80th St y calles en el lado este de Green Lake a más tardar para el 2019. Para solicitar la traducción de este material, llame al 206-693-4151.
西雅图市政府最快将于2019年铺设以下的部分路面:N 40th St, N 50th St, N 80th St以及 Green Lake 东边的街道。如 需這些資料的譯文,或是在會議時需要口譯服務,請 致電 206-693-4151。

Twitter
Facebook
Website
Copyright © 2020 Seattle Department of Transportation, All rights reserved.
You are receiving this email because you signed up for project updates for Green Lake Area Paving and Safety Projects.

Our mailing address is:
Seattle Department of Transportation
P.O. Box 34996
Seattle, Wa 98124-4996
Add us to your address book

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Seattle Department of Transportation · P.O. Box 34996 · Seattle, Wa 98124-4996 · USA

Email Marketing Powered by Mailchimp